On 23-24 December, the DPRK cut most of the seals and...
On 23-24 December, the DPRK cut most of the seals and impeded the functioning of surveillance equipment installed at both the fuel rod fabrication plant and the reprocessing facility,
On 23-24 December, the DPRK cut most of the seals and impeded the functioning of surveillance equipment installed at both the fuel rod fabrication plant and the reprocessing facility,